2 & 3 BHK Flats for Sale in Gandimaisamma & Kukatpally


Posted August 9, 2025 by speedhousing

Speed Housing LLP is a trusted Hyderabad developer of premium gated apartments—quality builds, modern design, on-time delivery. Landmark projects: Speed Sanarelli (Gandimaisamma) and Speed Signature (Kukatpally), built by Kura Homes.

 
Speed Sanarelli — Gandimaisamma (near Kompally / Miyapur / Bachupally / Gagillapur)
Overview
Community: Premium gated community across 5.75 acres

Towers & Homes: 5 towers, 756 spacious 2 & 3 BHK apartments

Clubhouse: Approx. 25,000 sft lifestyle clubhouse

Connectivity: ORR Exit 5 access with quick drives to Kompally, Miyapur, Bachupally, and Gagillapur

Location & Connectivity
ORR Exit 5 for fast airport/IT corridor access

Easy reach to KPHB / Miyapur Metro, schools, clinics, supermarkets, and daily conveniences

Growing residential ecosystem with strong rental demand and long-term appreciation drivers

Key Amenities
Clubhouse: Multipurpose hall, indoor games, library/reading lounge, co-working/meeting corners, yoga/meditation studio

Fitness & Leisure: Gym, swimming pool, toddler pool, aerobics/yoga deck

Outdoor: Central greens, jogging/walking track, children’s play areas, senior citizens’ sit-outs, amphitheatre

Sports: Half basketball/Badminton courts (as per final layout), indoor games (carrom/chess/table tennis)

Convenience: Creche/day-care room, guest rooms (subject to final plan), retail kiosk space (if applicable), ample parking

Sustainability & Safety: Rainwater harvesting, STP, solid-waste management, solar for common areas (as applicable), 24x7 security with CCTV, access-controlled lobbies

Specifications (Indicative)
Structure: RCC framed structure designed for relevant seismic codes

Walls: 8″ external walls for insulation & privacy; 4″ internal partitions

Windows: uPVC systems with float glass; integrated mosquito mesh tracks

Doors: Engineered wood frames; veneered/premium shutters with melamine/polish finish

Flooring: Vitrified tiles in living/dining/bedrooms; anti-skid tiles in balconies & toilets

Kitchen: Granite countertop with SS sink; provision for RO, hob & chimney

Baths: Premium CP fittings & sanitaryware; geyser & exhaust provisions

Electrical: Concealed copper wiring; modular switches; DG backup for common areas + in-flat essential load (as per contract)

Data/Comfort: TV/Telephone/Internet points; AC provisions in living & bedrooms; intercom

Construction Progress
Project is under active construction with ongoing civil works and sequential tower progress.

Regular site updates and milestone photos available on request; possession timelines as per the latest project schedule/RERA guidance.

Speed Signature — Kukatpally (near Nizampet X Road / KPHB)
Overview
Community: Boutique high-rise in a prime, city-connected micro-market

Towers & Homes: ~156 premium 2 & 3 BHK apartments (select configurations)

Clubhouse: Approx. 9,000 sft dedicated clubhouse

Connectivity: Minutes to KPHB Colony & Bhagyanagar Colony Metro (Hyderabad Metro Red Line), Nizampet X Road, malls & workplaces

Location & Connectivity
Quick access to Miyapur–KPHB–Ameerpet metro corridor

Proximity to schools, hospitals, supermarkets, IT hubs, entertainment & dining

Strong end-user and rental market; ideal for buyers who want city convenience

Key Amenities
Clubhouse: Indoor games, multi-purpose hall, party/lounge space, work pods/reading corners

Fitness: Equipped gym, yoga/meditation room

Lifestyle: Landscaped sit-outs, kids’ play areas, curated outdoor seating

Safety & Services: Access control, CCTV, visitor management, DG backup for common areas (and in-flat essential load as per spec), rainwater harvesting & STP

Specifications (Indicative)
Structure: RCC framed structure with quality materials and workmanship

Windows: uPVC glazed windows for light & ventilation

Doors & Finishes: Engineered wood frames with premium shutters/finishes

Flooring: Vitrified tiles in living/bedrooms; anti-skid in toilets/balconies

Bath & Kitchen: Branded CP & sanitaryware; granite kitchen platform with utility provisions

Electrical: Concealed copper wiring, modular switches, adequate points, AC provisions; earthing & safety devices as per code

Construction Progress
City-side project under construction, with structural and services works advancing phase-wise.

Site progress photos and tower-wise timelines can be shared on request; handover as per schedule/RERA guidance.

Why Choose Speed Housing LLP
Quality-first design & execution, customer-focused processes

Planned amenities and specifications that balance lifestyle, durability, and long-term maintenance

Transparent updates: Site progress shared at regular intervals; professional handover & post-possession support

Next Steps
Book a site visit to experience sample spaces, views, and amenity zones.

Ask for the latest inventory, pricing, and construction schedule for your preferred configuration.
--- END ---
Contact Email [email protected]
Issued By Speed Housing
Country India
Categories Real Estate
Tags 2 bhk flats for sale , 3 bhk flats for sale , commercial recidential builder in hyderabad , 2 3 bhk apartments in hyderabad , 2 bhk flats in gandimaisamma , 3 bhk flats in kukatpally , 2 bhk apartments in gandimaisamma , 3 bhk apartments in kukatpally
Last Updated August 9, 2025